Roads
Roads are a measure to the development of a region and form the very essence of economic and social development. KMC Constructions has primarily been into the development of roads and has successfully executed the completion of major highways, expressways, airport runways, and roads across towns, cities, factories and many such other areas. KMC Constructions has been one of the chief contractors of NHAI and has undertaken projects worth hundreds of Crores even in the most recent years.
List of BOT Projects
| :: Guruvyoor Infrastructure Pvt. Ltd | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Guruvyoor Infrastructure Pvt. LtdNational Highway Authority of India (NHAI), Ministry of Shipping, Road Transport and Highways, Govt. of India has awarded the National Highway 47 – KL-1 project to M/s Guruvayoor Infrastructure Pvt. Ltd (GIPL), Hyderabad, a company formed by M/s KMC Constructions Ltd (KMC), Hyderabad and SREI Infrastructures Finance Ltd, on Build Operate and Transfer basis (BOT). The entire project is being done under the BOT (Build Operate & Transfer) scheme of NHAI by M/s Guruvayoor Infrastructure Pvt. Ltd, a consortium formed by M/s KMC Constructions Ltd. Location MapProject Details
| |||||||||||||||||||||||
| :: Pinkcity Expressway Pvt. Ltd. | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Pinkcity Expressway Pvt. Ltd.Pink City Expressway Pvt. Ltd. (PCEPL) is a Special Purpose Vehicle Company incorporated by M/s Emirates Trading Agency LLC (ETA) and M/s KMC Constructions Ltd. (KMC) The main purpose of this venture is to “Undertake, promote, develop, finance, design, establish, engineer, procure, erect, construct, equip, operate, maintain, repair and upgrade the existing four-Lane Highway into Six Lane Highway. This highway will cover the following section : Gurgaon – Kotputli – Jaipur section of NH-8 from KM 42.70 to KM 273 in the state of Haryana / Rajasthan to be executed on BOT basis on Design, Build, Finance and Operate pattern under NHDP Phase-V and its ancillary facilities including Toll Plazas, connecting roads, buildings, commercial premises, hoardings, electric fittings, drains, waterways, water-pipes, telephone lines (the Project) and to change and collect tolls, fees, cess, rents from the users of the Project”. Location MapProject Details
| |||||||||||||||||||||||
| :: East Hyderabad Expressway Pvt. Ltd. | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
East Hyderabad Expressway Pvt. Ltd.This 8 Lane expressway part of prestigious Outer ring Road project is in a project closure stage. Initiated in late 2007, the 13 KM length is being done under on Build Operate and Transfer basis (BOT). Location MapProject Details
| |||||||||||||||||||||||
| :: Brindavan Infra Co. Ltd. | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Brindavan Infra Co. Ltd.Brindavan Infrastructure Company Limited (BICL) is a SPV setup to implement, operate and maintain the State Highway road project in Karnataka. Project Overview Location MapProject Details
| |||||||||||||||||||||||
| :: OB Infrastructure Ltd. | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
OB Infrastructure Ltd.OB Infrastructure Limited is the SPV incorporated to undertake the Construction, operation, maintenance of National highway in Uttar Pradesh. Location MapProject Details
| |||||||||||||||||||||||
| :: Rayalseema Expressway Ltd. | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Rayalseema Expressway Ltd.The Project entails upgrading the existing two lane Karnool – Cudappah Section in state of AP aggregating a project distance of 183 kms to a four lane divided carriageway for capacity improvement. This is BOT Project with KMCL & IVRCL being the shareholders. Location MapProject Details
| |||||||||||||||||||||||
| :: Thrissur Expressway Ltd. | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Thrissur Expressway Ltd.National Highway Authority of India (NHAI), Govt. of India has awarded the National Highway 47 – KL-1 project to M/s Thrissur Expressway Ltd, Hyderabad, a company formed by M/s KMC Constructions Ltd (KMC), Hyderabad on Build Operate and Transfer basis (BOT). The total project length is 28 KM of roadway connecting important section of Thrissur with Vadakkanchery. Location MapProject Details
| |||||||||||||||||||||||
| :: North Malabar Expressway Pvt. Ltd. | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
North Malabar Expressway Pvt. Ltd.Connecting Kannur with Vengalam, this 83.2 KM 4 lanning project is been initiated in Feb’2010. Expected date of completion is mid 2012. The project share holder is KMCL and is excuted under on a Build Operate and Transfer basis (BOT). Location MapProject Details
| |||||||||||||||||||||||
| :: South Malabar Expressway Pvt. Ltd. | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
South Malabar Expressway Pvt. Ltd.Connecting Vengalam with Kuttipuram, this 81 KM 4 lanning project is been initiated in Feb’2010. Expected date of completion is mid 2012. The project share holder is KMCL and is excuted under on a Build Operate and Transfer basis (BOT). Location MapProject Details
| |||||||||||||||||||||||
| :: Simhapuri Expressway Ltd. | |||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Simhapuri Expressway Ltd.The Project entails upgrading the existing Nellore – Chilakaluripet Section aggregating 183 kms to a six lane divided carriageway for capacity improvment. This is BOT Project with KMCL and BSCPL as its share holders. The project is expected to commence in mid 2011. Location MapProject Details
| |||||||||||||||||||||||